I've been doing a lot to my little mk2 since the last time I posted here, got sidetracked and forgot to update. Sorry. I'll post pictures and let them do the talking.
I'm currently putting together a 2L crossflow 8v engine for it which will be using 40mm Mikuni bike carbs. I hope to have the swap done by then end of October. I've also picked up an E28 which I turned from this: To this: The E28 will be getting some serious work done (respray, new interior, engine and gearbox swap etc..) once the major work with my mk2 is done. |
Nice update and nice Beemer
|
Quote:
Thank you :) |
All times are GMT +1. The time now is 11:16. |
Powered by vBulletin
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.